    Default Adaptation of turbocharger in 2.7/3.0TDi AUDI

    Anybody uses VAG CAN PRO or if anybody can recommend which device to use to calibrate 2.7 / 3.0 tdi turbo on bench?

  2. #2
    Junior Member
    Join Date
    Sep 2008
    Posts
    30
    Thanks Thanks Given 
    8
    Thanks Thanks Received 
    7
    Thanked in
    3 Posts

    Default

    Hello,

    The procedure is:

    Removing and installing turbocharger control unit 1 -J724-
    Special tools and workshop equipment required
    t Tester for E-positioner -VAS 6395-
    t Connection lead -VAS 6395/2-
    t Stop plate -VAS 6395/5-

    Removing
    – Remove engine cover panel -arrows-.

    – Open cover -arrow- above positive terminal.
    – Connect tester for E-positioner -VAS 6395- to positive terminal „+“ and negative terminal „–“ with connection lead -VAS 6395/2-.
    Procedure for tester for E-positioner -VAS 6395A/1-:

    – Select software version with buttons ↑-item 5- and ↓-item 6-.
    – To confirm software version, press v button -item 4-.
    NoteIn this example, software version Hella -item 1- is selected.
    Procedure for tester for E-positioner -VAS 6395/1-:

    Checking software version of tester for E-positioner -VAS 6395/1-:
    Caution
    Risk of damage to turbocharger 1 control unit -J724-.
    Before continuing, check whether the correct software version is loaded in the tester for E-positioner -VAS 6395/1-. To do so, proceed as follows:

    Display on -VAS 6395/1- (2 seconds after connecting to power supply) if correct software version is loaded:
    1 - > 1. START
    2 - 2. NEXT [>]
    Notet If the following appears on the display, an incorrect software version has been loaded:
    t 1. >TEST
    t 2. LEARN
    t If this is the case, download the correct software version from the „Audi ServiceNet“ under „Workshop Equipment“.

    Continued for both testers for E-positioner:
    – Unplug electrical connector for turbocharger 1 control unit -J724-.
    – Connect connection lead -VAS 6395/2- to turbocharger 1 control unit -J724- and to tester for E-positioner -VAS 6395-.

    Display on -VAS 6395-:
    1 - > 1. START
    2 - 2. NEXT [>]
    – To continue, press v button -item 4-.
    l The tester for E-positioner -VAS 6395- runs through the adjustment range of the turbocharger 1 control unit -J724- and checks whether the end positions are reached; display indicates „CHECK“.

    Display on -VAS 6395-:
    1 -
    2 - [OK]
    Notet If the display indicates „[OK]“, the adjustment range of the turbocharger 1 control unit -J724- is OK.
    t If the display shows „FAULT [OK]“, tap gently several times on the housing of turbocharger 1 control unit -J724- with the handle of a screwdriver and repeat the check by pressing v button -item 4-.

    – Secure stop plate -VAS 6395/5- with countersunk bolts supplied with and screwed into stop plate (8 Nm).
    Caution
    Measurement errors due to incorrect attachment of stop plate -VAS 6395/5-.
    t The stop plate should only be bolted on using the countersunk bolts supplied with the stop plate.
    t The stop plate must not be loosened until the work sequence has been completed.


    – To continue, press v button -item 4-.
    l The turbocharger 1 control unit -J724- moves back and forth between the stops several times to determine the voltage value.
    l Then the turbocharger 1 control unit -J724- moves into installation position.
    – While the voltage value is being determined, keep tapping gently on the housing of turbocharger 1 control unit -J724- until the display indicates the following:
    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [↑][↓][OK]
    – Note voltage value.
    l Specification: 3.3 ... 3.7 V
    NoteIf the display indicates „FAULT [OK]“ or the voltage is less than 3.3 V or greater than 3.7 V, unplug the tester for E-positioner -VAS 6395- and repeat the complete procedure → Anchor.

    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [↑][↓][OK]
    – By pressing buttons ↑-item 5- and ↓-item 6-, adjust turbocharger 1 control unit -J724- so that coupling rod can be accessed easily for removal.

    – Unclip circlips -arrows- and dispose of them, detach coupling rod.

    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [↑][↓][OK]
    – By pressing buttons ↑-item 5- and ↓-item 6-, adjust turbocharger 1 control unit -J724- so that bolts for -J724- can be accessed easily.

    – Disconnect connection lead -VAS 6395/2- from turbocharger 1 control unit -J724-.
    Caution
    Tester for E-positioner -VAS 6395- should remain connected to power supply.


    – Remove bolts -1, 2, 3- and dispose of them.
    – Remove old turbocharger 1 control unit -J724- and dispose of it.
    Caution
    Check that the three insulating washers are fitted between turbocharger 1 control unit -J724- and the bracket.

    – Install new turbocharger 1 control unit -J724- in reverse sequence of removal.
    – Fit new bolts as follows:
    1 - M6x15 with tapered shank
    2 - M6x15 with tapered shank
    3 - M6x15
    – Initially hand-tighten bolts.
    l Turbocharger 1 control unit -J724- must rest on retaining plate so there is no play; it must still be possible to move control unit by hand.

    – Connect connection lead -VAS 6395/2- to new turbocharger 1 control unit -J724-.

    – To continue, press v button -item 4-.
    Display on -VAS 6395-:
    1 - > 1. START
    2 - 2. NEXT [>]
    – Select menu item „NEXT“ with ↓ button -item 6-.

    – To continue, press v button -item 4-.
    l The tester for E-positioner -VAS 6395- runs through the adjustment range of the turbocharger 1 control unit -J724- and checks whether the end positions are reached; display indicates „CHECK“.
    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [OK]
    NoteIf the display indicates „FAULT“, the new turbocharger 1 control unit -J724- must be renewed for a second time.

    – To continue, press v button -item 4-.
    Display on -VAS 6395-:
    1 -
    2 - [OK]

    – To continue, press v button -item 4-.
    Display on -VAS 6395-:
    1 - X.XXX V (voltage determined with first measurement)
    2 - [OK]
    l Turbocharger 1 control unit -J724- moves into installation position.

    – Insert coupling rod.
    l Installation position: The thicker eyelet is fitted onto the shaft of turbocharger 1 control unit -J724-.
    – Fit circlips -arrows-.
    l The circlips must engage audibly.

    – Press turbocharger 1 control unit -J724- towards the rear without applying force -arrow- until lever -1- rests lightly on stop plate -VAS 6395/5-.
    – Hold -J724- in this position.

    – Tighten bolts -1, 2, 3- to 5 Nm.

    – To continue, press v button -item 4-.
    l Turbocharger 1 control unit -J724- moves back and forth between the stops several times and is adjusted to the voltage value determined with the first measurement.
    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [OK]
    Notet If [OK] is indicated on display, terminate adjustment → Anchor.
    t If „CHECK“ is indicated on display, proceed as follows.

    Procedure if display indicates „CHECK“:
    Display on -VAS 6395-:
    1 - [<<<]
    2 - CHECK
    or
    1 - [>>>]
    2 - CHECK

    – Loosen bolts -1, 2, 3- until turbocharger 1 control unit -J724- can just be moved by applying light force in the direction stated:
    l If display indicates [<<<], move -J724- slightly in direction of travel.
    l If display indicates [>>>], move -J724- slightly towards rear of vehicle.
    – Tighten bolts -1, 2, 3- to 5 Nm.

    – To continue, press v button -item 4-.
    l Turbocharger 1 control unit -J724- again moves back and forth between the stops several times and is adjusted to the voltage value determined with the first measurement.
    Display on -VAS 6395-:
    1 - X.XXX V (voltage determined with first measurement)
    2 - [OK]

    Terminating adjustment:
    – Tighten bolts -1, 2, 3- to 10 Nm.

    – To continue, press v button -item 4-.
    Display on -VAS 6395-:
    1 - X.XXX V
    2 - [OK]

    – Remove stop plate -VAS 6395/5-.
    – Secure electrical wiring with retaining clip -1-.

    – To continue, press v button -item 4-.
    l Turbocharger 1 control unit -J724- moves to end positions.
    NoteIf the display indicates „FAULT“, the new turbocharger 1 control unit -J724- must be renewed → Anchor.
    Display on -VAS 6395-:
    1 -
    2 - [OK]
    l Adjustment is completed.
    – Unplug electrical connectors for tester for E-positioner -VAS 6395-.
    Assemble in reverse order.

  3. The Following User Says Thank You to giuriadi For This Useful Post:

    klonone (1st October, 2016)

  4. #3
    DK Veteran
    miha99's Avatar
    Join Date
    Sep 2009
    Location
    EU
    Posts
    907
    Thanks Thanks Given 
    372
    Thanks Thanks Received 
    307
    Thanked in
    111 Posts

    Default

    Thank you M8, and how much does it cost this set?

  5. #4
    DK Veteran
    dimitar's Avatar
    Join Date
    Oct 2009
    Posts
    1,447
    Thanks Thanks Given 
    248
    Thanks Thanks Received 
    362
    Thanked in
    152 Posts

    Default

    Quote Originally Posted by miha99 View Post
    Thank you M8, and how much does it cost this set?
    same as vas5054 original
    50w Soldering Iron
    Chisel
    Sometimes Hammer

  6. The Following User Says Thank You to dimitar For This Useful Post:

    miha99 (23rd February, 2014)

  7. #5
    DK Veteran
    miha99's Avatar
    Join Date
    Sep 2009
    Location
    EU
    Posts
    907
    Thanks Thanks Given 
    372
    Thanks Thanks Received 
    307
    Thanked in
    111 Posts

    Default

    And no other alternative ???

  8. #6
    Junior Member
    Join Date
    Sep 2009
    Posts
    34
    Thanks Thanks Given 
    2
    Thanks Thanks Received 
    0
    Thanked in
    0 Posts

    Default

    Hi cost for this is around ?500.

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
This website uses cookies
We use cookies to store session information to facilitate remembering your login information, to allow you to save website preferences, to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners.